Search found 3895 matches
- Fri Apr 16, 2010 12:18 pm
- Forum: Centroid Oak, Allin1DC, MPU11 and Legacy products
- Topic: **RESOLVED** CNC11 update
- Replies: 23
- Views: 16577
Re: CNC11 update
You don't need a new pendant; that did not change at all. Instead, the internal numbers assigned to the pendant keys and LEDs in the PLC program (the JPI and JPO definitions) all changed. Instead of jumping all around based on function, the numbers are now assigned in order, row by column. The follo...
- Tue Mar 30, 2010 4:09 pm
- Forum: Centroid Oak, Allin1DC, MPU11 and Legacy products
- Topic: Mach3 based kit - Full Power Without Motion
- Replies: 5
- Views: 7128
Re: Mach3 based kit - Full Power Without Motion
I would check the Axis 2 and Axis 3 fuses on the DC3IOB board as well.
- Mon Mar 29, 2010 12:14 am
- Forum: Centroid Oak, Allin1DC, MPU11 and Legacy products
- Topic: (404) Spindle Fault on CNC11 with GPIO4D
- Replies: 2
- Views: 4639
Re: (404) Spindle Fault on CNC11 with GPIO4D
This is totally dependent on the PLC program you are using.
However, more likely than not your PLC program follows the convention of recent years: bit 1 (value 2) of Parameter 178 selects a normally-closed spindle fault. Otherwise spindle fault is assumed to be normally-open.
However, more likely than not your PLC program follows the convention of recent years: bit 1 (value 2) of Parameter 178 selects a normally-closed spindle fault. Otherwise spindle fault is assumed to be normally-open.
- Thu Mar 25, 2010 3:40 pm
- Forum: Centroid Oak, Allin1DC, MPU11 and Legacy products
- Topic: **RESOLVED** TECO FM50 Spindle Inverter Wiring and DC3IOB
- Replies: 13
- Views: 14348
Re: TECO FM50 Spindle Inverter Wiring and DC3IOB
To further cloud the question of whether to have Emergency Stop break the line power, or just the enables: If you break the enables and leave line power on, then the inverter can provide dynamic braking (decelerating the spindle and dumping the power into the braking resistor). If you cut off line p...
- Wed Mar 24, 2010 6:11 pm
- Forum: Centroid Oak, Allin1DC, MPU11 and Legacy products
- Topic: **RESOLVED** TECO FM50 Spindle Inverter Wiring and DC3IOB
- Replies: 13
- Views: 14348
Re: TECO FM50 Spindle Inverter Wiring and DC3IOB
Rather than wiring directly from "SPIN RESET COM" to "SPIN EN COM", you should route that wire through an open pole of your emergency stop contactor or relay. This will ensure that the run signal (forward or reverse) gets cut off when you press emergency stop, even if the compute...